Roadway Construction in Texas
Broadway Corridor Phase IIIA
Contract Amount: $16.4 Million
Duration: 2013 to 2016
Location: San Antonio, TX
Client: City of San Antonio
This project included a total reconstruction of both Broadway and Hildebrand Streets, extending 1500+/- LF in all directions and a historic park restoration. We took on the following tasks for this job:
- Extensive Traffic Control
- New Water & Wastewater
- Traffic Signals
- Retaining Walls
- Curb
- Sidewalk
- Roadway Excavation & Embankment
- Moisture Controlled Treated Subgrade with Geo Grid Reinforcement
- Complex Box Culvert Upgraded Storm Water System
- 13” of Type “B” Asphalt & 2” of Type “D” Surface
- Drives
- Landscape & Hardscapes
Contact us to discuss the details of your project. Our construction services are available throughout Texas.